{"id":31313,"date":"2018-10-11T03:34:56","date_gmt":"2018-10-11T07:34:56","guid":{"rendered":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/?p=31313"},"modified":"2018-10-11T16:54:54","modified_gmt":"2018-10-11T20:54:54","slug":"pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149","status":"publish","type":"post","link":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/","title":{"rendered":"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149"},"content":{"rendered":"<p class=\"p2\">By Maureen Werther<\/p>\n<p class=\"p3\"><span class=\"s1\">A stretch of road along Route 9, from Route 149 to Sweet Road in Queensbury (Exit 20), is the subject of a $100,000 traffic study, an area for \u201ctargeted growth, investment, revenue and new jobs\u201d that is expected to span over the next decade, according to Ed Bartholomew, president and CEO of EDC Warren County.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">The study was completed by the engineering firm of Creighton Manning LLP and funded by EDC Warren County, Warren County and National Grid. In September,<span class=\"Apple-converted-space\">\u00a0 <\/span>EDC Warren County held what was billed as an \u201copen house and interactive meeting\u201d to discuss he study.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Currently, the area has a mix of residential homes and commercial businesses. According to the press release put out by EDC, the \u201csuccess and growth of this corridor collectively over time has led to increased traffic and congestion beyond normal seasonal peaks.\u201d <\/span><!--more--><\/p>\n<p class=\"p3\"><span class=\"s1\">In addition to the congestion, the roadway has increasingly become more dangerous for pedestrians and more difficult for emergency vehicles to get through during heavy traffic periods.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">The open house meeting gave residents and business owners an opportunity to hear the results of the study and discuss some of the options that were put forth by Creighton.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Creighton\u2019s study concluded that the existing three-lane road had reached its capacity, with the resulting consequence of shoppers going out of their way to avoid the area\u2014not a plus for existing businesses along the route or for future development in the area.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Creighton outlined three options to ease traffic near the outlet mall, which included widening the existing roadway from three lanes to five, with a turning lane median; constructing roundabouts with raised medians; or creating an access road to Route 149 from the east. <\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">The other option would be to leave the existing route as is, an alternative that Bartholomew and others feel would impede future growth and deter investment, new businesses and, by extension, new customers from traveling to the area. <\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">The Creighton study estimated that the first two of the three alternatives would cost in the $10 million range, with the third choice estimated to cost between $10-$15 million. <\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Another option\u2014that would involve the relocation of the I-87 exit further to the north and costing upwards for $75 million\u2014was determined to be unfeasible because it was unlikely that the state would provide the necessary funding. <\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Currently, there is no funding available for any of the other three options, with the plan being to reach a decision on the best alternative and then seek funding from local, state and federal sources.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Bartholomew said that there was lively and interactive discussion of all options, with the pros and cons of each alternative raised by attendees and representatives from Creighton and from EDC members.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">The general consensus seemed to be leaning toward installing roundabouts, as well as widening the road. <\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">While nothing was decided, Bartholomew stressed the importance of implementing improvements to the Corridor, regardless of which option people were considering.<\/span><\/p>\n<p class=\"p3\"><span class=\"s1\">Another meeting is scheduled for December, at which tine a final report will be issued.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Maureen Werther A stretch of road along Route 9, from Route 149 to Sweet Road in Queensbury (Exit 20), is the subject of a $100,000 traffic study, an area for \u201ctargeted growth, investment, revenue and new jobs\u201d that is expected to span over the next decade, according to Ed Bartholomew, president and CEO of [&hellip;]<\/p>\n","protected":false},"author":89,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-31313","post","type-post","status-publish","format-standard","hentry","category-business-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\r\n<title>Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149 - Glens Falls Business Journal<\/title>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149 - Glens Falls Business Journal\" \/>\r\n<meta property=\"og:description\" content=\"By Maureen Werther A stretch of road along Route 9, from Route 149 to Sweet Road in Queensbury (Exit 20), is the subject of a $100,000 traffic study, an area for \u201ctargeted growth, investment, revenue and new jobs\u201d that is expected to span over the next decade, according to Ed Bartholomew, president and CEO of [&hellip;]\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/\" \/>\r\n<meta property=\"og:site_name\" content=\"Glens Falls Business Journal\" \/>\r\n<meta property=\"article:published_time\" content=\"2018-10-11T07:34:56+00:00\" \/>\r\n<meta property=\"article:modified_time\" content=\"2018-10-11T20:54:54+00:00\" \/>\r\n<meta name=\"author\" content=\"Jake Van Ness\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jake Van Ness\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/2018\\\/10\\\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/2018\\\/10\\\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\\\/\"},\"author\":{\"name\":\"Jake Van Ness\",\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/#\\\/schema\\\/person\\\/a11ec438b5f0e57f1156754ba3931b86\"},\"headline\":\"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149\",\"datePublished\":\"2018-10-11T07:34:56+00:00\",\"dateModified\":\"2018-10-11T20:54:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/2018\\\/10\\\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\\\/\"},\"wordCount\":513,\"articleSection\":[\"Business News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/2018\\\/10\\\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\\\/\",\"url\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/2018\\\/10\\\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\\\/\",\"name\":\"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149 - Glens Falls Business Journal\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/#website\"},\"datePublished\":\"2018-10-11T07:34:56+00:00\",\"dateModified\":\"2018-10-11T20:54:54+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/#\\\/schema\\\/person\\\/a11ec438b5f0e57f1156754ba3931b86\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/2018\\\/10\\\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/2018\\\/10\\\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/2018\\\/10\\\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/#website\",\"url\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/\",\"name\":\"Glens Falls Business Journal\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/#\\\/schema\\\/person\\\/a11ec438b5f0e57f1156754ba3931b86\",\"name\":\"Jake Van Ness\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0d74f7533bd2ebb3908a187893d5eafbf1ee7752b11715c976372134cbea918d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0d74f7533bd2ebb3908a187893d5eafbf1ee7752b11715c976372134cbea918d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/0d74f7533bd2ebb3908a187893d5eafbf1ee7752b11715c976372134cbea918d?s=96&d=mm&r=g\",\"caption\":\"Jake Van Ness\"},\"url\":\"https:\\\/\\\/www.glensfalls.com\\\/glensfallsbusinessjournal\\\/author\\\/jakev\\\/\"}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149 - Glens Falls Business Journal","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/","og_locale":"en_US","og_type":"article","og_title":"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149 - Glens Falls Business Journal","og_description":"By Maureen Werther A stretch of road along Route 9, from Route 149 to Sweet Road in Queensbury (Exit 20), is the subject of a $100,000 traffic study, an area for \u201ctargeted growth, investment, revenue and new jobs\u201d that is expected to span over the next decade, according to Ed Bartholomew, president and CEO of [&hellip;]","og_url":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/","og_site_name":"Glens Falls Business Journal","article_published_time":"2018-10-11T07:34:56+00:00","article_modified_time":"2018-10-11T20:54:54+00:00","author":"Jake Van Ness","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jake Van Ness","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/#article","isPartOf":{"@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/"},"author":{"name":"Jake Van Ness","@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/#\/schema\/person\/a11ec438b5f0e57f1156754ba3931b86"},"headline":"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149","datePublished":"2018-10-11T07:34:56+00:00","dateModified":"2018-10-11T20:54:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/"},"wordCount":513,"articleSection":["Business News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/","url":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/","name":"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149 - Glens Falls Business Journal","isPartOf":{"@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/#website"},"datePublished":"2018-10-11T07:34:56+00:00","dateModified":"2018-10-11T20:54:54+00:00","author":{"@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/#\/schema\/person\/a11ec438b5f0e57f1156754ba3931b86"},"breadcrumb":{"@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/2018\/10\/pathway-corridor-traffic-study-reveals-options-for-improving-routes-9-and-149\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/"},{"@type":"ListItem","position":2,"name":"Pathway Corridor Traffic Study Reveals Options For Improving Routes 9 And 149"}]},{"@type":"WebSite","@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/#website","url":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/","name":"Glens Falls Business Journal","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/#\/schema\/person\/a11ec438b5f0e57f1156754ba3931b86","name":"Jake Van Ness","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0d74f7533bd2ebb3908a187893d5eafbf1ee7752b11715c976372134cbea918d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0d74f7533bd2ebb3908a187893d5eafbf1ee7752b11715c976372134cbea918d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0d74f7533bd2ebb3908a187893d5eafbf1ee7752b11715c976372134cbea918d?s=96&d=mm&r=g","caption":"Jake Van Ness"},"url":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/author\/jakev\/"}]}},"_links":{"self":[{"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/posts\/31313","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/users\/89"}],"replies":[{"embeddable":true,"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/comments?post=31313"}],"version-history":[{"count":1,"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/posts\/31313\/revisions"}],"predecessor-version":[{"id":31314,"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/posts\/31313\/revisions\/31314"}],"wp:attachment":[{"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/media?parent=31313"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/categories?post=31313"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.glensfalls.com\/glensfallsbusinessjournal\/wp-json\/wp\/v2\/tags?post=31313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}